Six lane upgradable to Eight lane of Kanpur Lucknow Expressway including spur from Km 28+500 to Km 73+744 in the state of Uttar Pradesh on Hybrid Annuity mode under Bharatmala Pariyojana (Package-2) (the “Project”) on design, build, operate and transfer basis (the “DBOT Annuity” of Hybrid Annuity)
12.05.2022
HAM
30 Months
BPC: 1513.00 1st Yr O&M : 3.00 NHAI Price: 1377.55 Crore
10.11.2022
NHAI
45.244
1602.95
15.03.2022
-