Four Laning of Sonauli - Gorakhpur section of NH-29E from Design Ch. 0+000 to Design Ch. 79+540 (from Existing Ch. 0+000 to Existing Ch. 80+295) on Hybrid Annuity Mode in the state of Uttar Pradesh thereof (the “Project”) on design, build, operate and transfer (the “Hybrid Annuity)" basis
08.09.2022
HAM
24 Months
BPC: 1458.00 1st Yr O&M : 6.00 NHAI Price: 1382.48 Crore
-
NHAI
79.54
1608.23
30.03.2022
-