Construction, of Six Lane with Access Controlled Greenfield Highway from km 26.000 to km 97.000, MH/KN Border (Badadal) to Maradgi S Andola section of NH – 150C (Package-II of Akkalkot to KN/TS Border section) on Hybrid Annuity Mode under Bharatmala Pariyojna (approximately 71.000 km) in the State of Karnataka by Six-Laning thereof (the “Project”) on design, build, operate and transfer (the “DBOT Annuity” or “Hybrid Annuity)" basis
31.05.2022
HAM
30 Months
BPC: 1575.00 1st Yr O&M : 3.60 NHAI Price: 1437.72 Crore
28.12.2022
NHAI
71
1769.02
30.03.2022
-