Mathur Bypass to Gaju Village (Pkg-IB)

Details

Four laning of NH 530B from Mathura Bypass (Start) (Existing km. 266.000 of SH 33/Design km 0.000) to Gaju Village (End) (Design km. 32.982) (Design Length= 32.982 km) in the state of Uttar Pradesh on Hybrid Annuity Mode (Package 1-B) Four-Laning thereof (the “Project”) on design, build, operate and transfer (the “DBOT Annuity” or “Hybrid Annuity”) basis

Agreement Date:

20.07.2022

Mode of Bid:

HAM

Time of completion:

24 Months

Awarded/LOA cost

BPC: 885.00 1st Yr O&M : 3.00 NHAI Price: 832.83 Crore

Date of Start:

-

Employer:

NHAI

Total Length (in KM):

32.982

Tender Cost (in Crore):

1064.5

LOA Date:

29.03.2022

Completion Date:

-