Four laning of NH 530B from Mathura Bypass (Start) (Existing km. 266.000 of SH 33/Design km 0.000) to Gaju Village (End) (Design km. 32.982) (Design Length= 32.982 km) in the state of Uttar Pradesh on Hybrid Annuity Mode (Package 1-B) Four-Laning thereof (the “Project”) on design, build, operate and transfer (the “DBOT Annuity” or “Hybrid Annuity”) basis
20.07.2022
HAM
24 Months
BPC: 885.00 1st Yr O&M : 3.00 NHAI Price: 832.83 Crore
-
NHAI
32.982
1064.5
29.03.2022
-